After-sales Service: | Remote Operation, Video Calls, House Calls |
---|---|
Warranty: | 1 Year |
Application: | Industry, School, Hospital, Lab |
Customized: | Customized |
Certification: | CE, ISO |
Structure: | Console Mode |
Customization: |
---|
Suppliers with verified business licenses
The three-tank thermal shock test chamber is used to assess the ability of products (complete machines), components, parts, etc. to withstand sudden changes in temperature. This temperature shock test can understand the impact of temperature changes on the test sample once or multiple times.The main parameters affecting the temperature change test are the high and low temperature values of the temperature change range, the holding time of the sample at high and low temperatures, and the number of cycles of the test.It is generally used in a wide range of fields, from research and development to inspection and production.
The three-box structure uses pneumatic valves to switch the connection between the test area and the cold area, and between the test area and the hot area. During testing, the air valves in the high-temperature and low-temperature areas are automatically opened, allowing for high- and low-temperature shock testing. This shock method ensures that the product under test does not experience any mechanical shocks.
Large touch screen controller, easy to operate, can set and display various operating data.GB/T2423.1-2008 Environmental testing of electrical and electronic products Part 2 Test methods Test A Low temperature
GB/T2423.2-2008 Environmental testing of electrical and electronic products Part 2: Test methods Test B: High temperature
GB/T2423.22-2012 Environmental Test Part 2: Test Method Test N: Temperature Change
GJB150.5-2009 Environmental test methods for MIL equipment - Temperature shock test
GJB150.5A-2009 MIL equipment laboratory environmental test methods Part 5: Temperature shock test
GJB360B-2009 Test methods for electronic and electrical components
GB/T2423.1-2008/IEC6008-2-1-2007 Environmental testing of electrical and electronic products Part 2: Test methods Test A: Low temperature
GB/T2423.2-2008 Environmental testing of electrical and electronic products Part 2: Test methods Test B: High temperature
GB/T10589-2008 Technical conditions for low temperature test chamber
GB/T11158-2008 High temperature test chamber technical conditions
IEC68-2-14 Test method N: Temperature change
Main Specifications | ||
Cabinet: | ||
Studio size | Approximately W 1000 × H 1000 × D 1000 (mm) (W width × H height × D depth) | |
Dimensions | Approximately 1950×2350×2250(mm), subject to the actual object | |
Volume | 1000L; | |
Noise | Within 75dB (measured 1 meter from the front of the machine and 1.2 meters from the ground) | |
Temperature: | ||
High temperature zone |
Temperature range | RTºC~+200ºC |
Heating time | RT~+200ºC: about 30min | |
Low temperature zone |
Temperature range | RT~-55ºC |
Cooling time | RT~-55ºC: about55min | |
Studio |
Temperature shock range | -65ºC~+150ºC |
Temperature fluctuation | ≤±0.5 | |
Temperature deviation | ≤±2ºC | |
Temperature uniformity | ≤2ºC | |
Temperature conversion time | ≤10s(Damper opening time) | |
Temperature recovery time | ≤4min | |
Operation mode | There are two high and low temperature impact modes and high and low temperature + room temperature impact modes, which can be set by the human-machine interface. | |
High and low temperature shock mode | 150ºC(30min)-NC--40ºC(30min) | |
High and low temperature + room temperature impact mode | 150ºC(30min)-room temperature--40ºC(30min) | |
Power | High greenhouse power: 9KW Low temperature greenhouse power: 9KW Other power about: 2KW Maximum power about: 20KW Operating power approximately: 12KW |
|
Voltage | Power requirements: 380V 50HZ three-phase five-wire system plus ground wire Power: 20KW Current 40A |
|
Condensation method | Water cooling |
Suppliers with verified business licenses