Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Power Supply: | AC 380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Thermal Shock Test Chamber is used to test the bearing extent of the material structures and composite material in an instant and continuous high temperature and extremely low temperature environment , that is in the shortest time to test its thermal expansion and contraction caused by chemical change or physical harm. Testing box is divided into three parts, one is high-temperature zone, another is low-temperature zone, the testing samples are placed in the center zone, using unique heat storage and cool storage with valve open and close, let the extremely high and low temperature impact the specimen
•GB-2423.1-2008(IEC68-2-1) Test A: Low Temperature Test
•GB-2423.2-2008(IEC68-2-2) Test B: High Temperature Test
•GJBl50.3-2009(MIL-STD-810D) High Temperature Test
•GJBl50.4-2009(MIL-STD-810D) Low Temperature Test
•GJBl50.5-2009 Temperature shock test method
1. Use the internationally accepted energy storage method to conduct impact tests at hot and cold temperatures.
2. Touch-sensitive color LCD display human-machine interface controller, easy to operate.The pre-cooling area, preheating area and test area are independent. The three boxes can be switched through the air door without moving the test product. When the room temperature is affected, the ambient temperature is introduced into the test space through the blower to eliminate the heat or cold in the test space. At the same time, The damper of the high and low temperature tanks is closed; when the low temperature is hit, the dampers of the high temperature and normal temperature tanks are closed, and the low temperature tank is connected to the test chamber, and the pre-stored cold energy is instantly introduced into the test chamber; when the high temperature is hit, the dampers of the low temperature and normal temperature tanks are closed, and the high temperature tank is connected to the test chamber. , instantly introducing the pre-stored heat into the test chamber. This achieves the purpose of rapid temperature changes.
Main Specifications | ||
Cabinet: | ||
Studio size | Approximately W 600 × H 750 × D 500 (mm) (W width × H height × D depth) | |
Dimensions | Approximately 1550×2100×1750(mm), subject to the actual object | |
Volume | 225L; | |
Noise | Within 75dB (measured 1 meter from the front of the machine and 1.2 meters from the ground) | |
Temperature: | ||
High temperature zone |
Temperature range | RTºC~+200ºC |
Heating time | RT~+200ºC: about 30min | |
Low temperature zone |
Temperature range | RT~-55ºC |
Cooling time | RT~-55ºC: about55min | |
Studio |
Temperature shock range | -65ºC~+150ºC |
Temperature fluctuation | ≤±0.5 | |
Temperature deviation | ≤±2ºC | |
Temperature uniformity | ≤2ºC | |
Temperature conversion time | ≤10s(Damper opening time) | |
Temperature recovery time | ≤4min | |
Operation mode | There are two high and low temperature impact modes and high and low temperature + room temperature impact modes, which can be set by the human-machine interface. | |
High and low temperature shock mode | 150ºC(30min)-NC--40ºC(30min) | |
High and low temperature + room temperature impact mode | 150ºC(30min)-room temperature--40ºC(30min) | |
Power | High greenhouse power: 9KW Low temperature greenhouse power: 9KW Other power about: 2KW Maximum power about: 20KW Operating power approximately: 12KW |
|
Voltage | Power requirements: 380V 50HZ three-phase five-wire system plus ground wire Power: 20KW Current 40A |
|
Condensation method | Water cooling |
1.Q :How to provide after-sales service?
A:If customers need our engineers to come to the site for service, we will send out engineers to provide repair service for you.
2.Q: Can we visit and study in your factory?
A: Welcome to visit and study in our factory, we will show you our R&D and production capacity.
3.Q :Can I install and commission the calibration equipment on site?
A: Yes, we can send technicians and engineers to the customer's site for installation, commissioning and calibration.
4.Q: What are the transportation methods?
A :Air freight, sea freight, railroad transportation, all transportation methods according to the customer's needs.
5.Q : What are the packing methods?
A: Standard export wooden box packaging, solid and firm.
6.Q :How do you calibrate the equipment?
A: We have our own calibration and third-party calibration.
7.Q :What are the payment methods?
A :The payment methods are T/T, CIF, Paypal, L/C, VISA and so on.
8.Q :How long is the warranty period?
A :Warranty is 1 year, lifetime free service.
9.Q :What is the delivery time for your company's products?
A :This depends on the actual product you order, usually at least 30 days.