Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Power Supply: | AC 380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Three zones thermal shock chambers can be used to test the tolerance of products in the continuously changing temperature environment between two extreme temperatures. Through thermal shock testing, we can understand the failure of the product due to repeated changes in temperature.
Three zones thermal shock chambers are mainly composed of independent product testing area, high temperature heat storage area and low temperature storage area. In addition, there are auxiliary refrigeration units and electrical control cabinets.
Three Zones Thermal Shock Chambers Test Standards
GB/T 2423.1-2008 (IEC68-2-1) Test Ab: low temperature test method.
GB/T 2423.2-2008 (IEC68-2-2) Test Bb: High temperature test method.
GJB360.8-2009 (MIL-STD.202F) High temperature life test.
GJBl50.3-2009 (MIL-STD-810D) High temperature test method.
GJBl50.4-2009 (MIL-STD-810D) Low temperature test method.
1.Intelligent, energy-saving refrigeration design: Independent cold-side and hot-side PID regulation to reduce energy waste.
2.Prevent condensation and frost: High and low temperature resistant silicone rubber seal and door frame anti-condensation electric heating device.
3.Insulation layer material:Low -temperature zone: Rigid polyurethane foam insulation layer, flame retardant B2.High temperature zone: Glass fiber cotton insulation layer, flame retardant A1.
4.Solid and durable structure: High quality cold-rolled steel plate external chamber, the surface static powder paint. SUS304 stainless steel plate inner chamber.
The pre-cooling area, preheating area and test area are independent. The three boxes can be switched through the air door without moving the test product. When the room temperature is affected, the ambient temperature is introduced into the test space through the blower to eliminate the heat or cold in the test space. At the same time, The damper of the high and low temperature tanks is closed; when the low temperature is hit, the dampers of the high temperature and normal temperature tanks are closed, and the low temperature tank is connected to the test chamber, and the pre-stored cold energy is instantly introduced into the test chamber; when the high temperature is hit, the dampers of the low temperature and normal temperature tanks are closed, and the high temperature tank is connected to the test chamber. , instantly introducing the pre-stored heat into the test chamber. This achieves the purpose of rapid temperature changes.
Main Specifications | ||
Cabinet: | ||
Studio size | ApproximatelyW 500 × H 450 × D 400 (mm) (W width × H height × D depth) | |
Dimensions | Approximately 1450×1800×1650(mm), subject to the actual object | |
Volume | 100L; | |
Noise | Within 75dB (measured 1 meter from the front of the machine and 1.2 meters from the ground) | |
Temperature: | ||
High temperature zone |
Temperature range | RTºC~+200ºC |
Heating time | RT~+200ºC: about 30min | |
Low temperature zone |
Temperature range | RT~-55ºC |
Cooling time | RT~-55ºC: about55min | |
Studio |
Temperature shock range | -65ºC~+150ºC |
Temperature fluctuation | ≤±0.5 | |
Temperature deviation | ≤±2ºC | |
Temperature uniformity | ≤2ºC | |
Temperature conversion time | ≤10s(Damper opening time) | |
Temperature recovery time | ≤4min | |
Operation mode | There are two high and low temperature impact modes and high and low temperature + room temperature impact modes, which can be set by the human-machine interface. | |
High and low temperature shock mode | 150ºC(30min)-NC--40ºC(30min) | |
High and low temperature + room temperature impact mode | 150ºC(30min)-room temperature--40ºC(30min) | |
Power | High greenhouse power: 9KW Low temperature greenhouse power: 9KW Other power about: 2KW Maximum power about: 20KW Operating power approximately: 12KW |
|
Voltage | Power requirements: 380V 50HZ three-phase five-wire system plus ground wire Power: 20KW Current 40A |
|
Condensation method | Water cooling |
1.Q :How to provide after-sales service?
A:If customers need our engineers to come to the site for service, we will send out engineers to provide repair service for you.
2.Q: Can we visit and study in your factory?
A: Welcome to visit and study in our factory, we will show you our R&D and production capacity.
3.Q :Can I install and commission the calibration equipment on site?
A: Yes, we can send technicians and engineers to the customer's site for installation, commissioning and calibration.
4.Q: What are the transportation methods?
A :Air freight, sea freight, railroad transportation, all transportation methods according to the customer's needs.
5.Q : What are the packing methods?
A: Standard export wooden box packaging, solid and firm.
6.Q :How do you calibrate the equipment?
A: We have our own calibration and third-party calibration.
7.Q :What are the payment methods?
A :The payment methods are T/T, CIF, Paypal, L/C, VISA and so on.
8.Q :How long is the warranty period?
A :Warranty is 1 year, lifetime free service.
9.Q :What is the delivery time for your company's products?
A :This depends on the actual product you order, usually at least 30 days.