Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Power Supply: | AC 380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ANSI AHAM AC-1-2006 | Test Method for Performance of Household Electric Power Cords or Indoor Air Cleaners |
GB/18801-2015 | Air Purifier |
GB/18803-2002 | Indoor Air Quality Standard |
IEC 62301:2005 | Measurement of standby power in household appliances EPA Energy star United States Environmental Protection Agency Energy Star |
EPA Energy star United States Environmental Protection Agency Energy Star | |
GB 4706.45-2008/IEC 60335-2-65:2005(Ed2.0) | Electrical safety for household and similar purposes - Particular requirements for air purifiers |
GB50243-2002 | Code for acceptance of construction of ventilation and air-conditioning engineering |
GB7251-1997 | Low-voltage switchgear and control equipment |
Test chamber volume | 3m³ |
Test chamber size | 1.4 m×1.4 m×1.5 m =2.94m3,Allow ±0.1m3 deviation |
Temperature and humidity | Standard temperature(23±2)ºC,Relative humidity(50±10) The temperature is adjustable between 18°C and 28°C, and the relative humidity is adjustable between 30 and 70°C. |
Frame | Stainless steel frame (2mm), mounted on the floor. Can be moved as a whole. The installation of pulleys ensures easy movement. |
Wall | 2mm stainless steel mirror panel is selected, which is strong and beautiful, the wall opens the door, and there is a glass observation port. |
Floor | The thickness is 2mm stainless steel mirror panel. |
Roof | 2mm stainless steel mirror panel is selected, which is strong and beautiful. |
Sealing material | Use silicone rubber strips and glass sealant. |
Incoming sampling tube material | Stainless steel or polytetraethylene, four injection ports and four sampling ports are required. |
Stirring device | Small fan (stainless steel), the fan is equipped with a protective net to ensure the stability and the mixing degree is guaranteed to be above 80. |
Exhaust | With exhaust duct, can be used for sewage. |
Operating gloves | Operation gloves are installed on the test bulkhead to facilitate the operation of the purifier during the test. |
Mobile platform | A movable platform is installed inside the test chamber to facilitate the movement of the purifier during the test |
Air tightness | The air leakage rate in the test chamber should be less than 0.05 h-1. (natural decay experiment) |