3m³ Air Purifier Energy Efficiency Test Chamber

  • Audited Supplier
  • 4 yrs

Contact Supplier

Product Highlights

  • Comprehensive Warranty Coverage: 1-year warranty with lifetime free service for all mechanical defects.
  • Flexible Customization Options: Supports full customization from samples and designs to meet specific needs.
  • Advanced Humidity Regulation: Relative humidity adjustable between 30% and 70% for precise testing.
  • Durable Stainless Steel Construction: 2mm stainless steel mirror panel walls, floor, and roof for strength.
  • Low Air Leakage Rate: Air leakage rate less than 0.05 h-1 ensures high airtightness.
  • Multiple Certification Compliance: Meets CE, TUV, ISO, AHAM AC-1, and GB/18801-2015 standards.
  • Mobile Platform Design: Equipped with pulleys for easy movement and a movable internal platform.

Product Images of 3m³ Air Purifier Energy Efficiency Test Chamber

3m³ Air Purifier Energy Efficiency Test Chamber
3m³ Air Purifier Energy Efficiency Test Chamber pictures & photos
3m³ Air Purifier Energy Efficiency Test Chamber
3m³ Air Purifier Energy Efficiency Test Chamber pictures & photos
3m³ Air Purifier Energy Efficiency Test Chamber
3m³ Air Purifier Energy Efficiency Test Chamber pictures & photos
3m³ Air Purifier Energy Efficiency Test Chamber
3m³ Air Purifier Energy Efficiency Test Chamber pictures & photos
3m³ Air Purifier Energy Efficiency Test Chamber
3m³ Air Purifier Energy Efficiency Test Chamber pictures & photos
3m³ Air Purifier Energy Efficiency Test Chamber
3m³ Air Purifier Energy Efficiency Test Chamber pictures & photos
3m³ Air Purifier Energy Efficiency Test Chamber
  • 3m³ Air Purifier Energy Efficiency Test Chamber
  • 3m³ Air Purifier Energy Efficiency Test Chamber
    3m³ Air Purifier Energy Efficiency Test Chamber
  • 3m³ Air Purifier Energy Efficiency Test Chamber
    3m³ Air Purifier Energy Efficiency Test Chamber
  • 3m³ Air Purifier Energy Efficiency Test Chamber
    3m³ Air Purifier Energy Efficiency Test Chamber
  • 3m³ Air Purifier Energy Efficiency Test Chamber
    3m³ Air Purifier Energy Efficiency Test Chamber
  • 3m³ Air Purifier Energy Efficiency Test Chamber
    3m³ Air Purifier Energy Efficiency Test Chamber
  • 3m³ Air Purifier Energy Efficiency Test Chamber
    3m³ Air Purifier Energy Efficiency Test Chamber

Find Similar Products

Product Description

Product Description


The 3m³ air purifier energy efficiency limit value test chamber is mainly used for the limited space device of the purifier's ability to remove target pollutants in the air. It can be CCM test equipment for the cumulative purification capacity of specific pollutants.
 

Machine structure


1. Stirring fan
2.Test prototype
3. Air filter
4.Air supply valve
5. Exhaust valve
6.Pollutant detection device
7.Pollutant generating device
8. Sampling port and sample feeding port
9.Airtight door
10. Air-conditioning supply air (and air supply when exhausting)
11. Air conditioning return air (and exhaust air)

 
Basic test items:

1. Smoke CADR test and analysis system

Refer to the AHAM AC-1 standard, test the CADR value of smoke, and intuitively evaluate the purification performance index of the purifier for particulate matter (including PM2.5).

2. Formaldehyde purification efficiency test

Test the formaldehyde removal efficiency in a 3 cubic meter test chamber for 1 to 6 hours.

3. VOC purification efficiency test

Test the VOC (in toluene) removal efficiency in a 3 cubic meter test chamber for 1 to 6 hours.
 

Meet the standards

 

ANSI AHAM AC-1-2006 Test Method for Performance of Household Electric Power Cords or Indoor Air Cleaners
GB/18801-2015 Air Purifier
GB/18803-2002 Indoor Air Quality Standard
IEC 62301:2005 Measurement of standby power in household appliances EPA Energy star United States Environmental Protection Agency Energy Star
  EPA Energy star United States Environmental Protection Agency Energy Star
GB 4706.45-2008/IEC 60335-2-65:2005(Ed2.0) Electrical safety for household and similar purposes - Particular requirements for air purifiers
GB50243-2002 Code for acceptance of construction of ventilation and air-conditioning engineering
GB7251-1997 Low-voltage switchgear and control equipment

 

Product Parameters

 

Test chamber volume 3m³
Test chamber size 1.4 m×1.4 m×1.5 m =2.94m3,Allow ±0.1m3 deviation
Temperature and humidity Standard temperature(23±2)ºC,Relative humidity(50±10)
The temperature is adjustable between 18°C and 28°C, and the relative humidity is adjustable between 30 and 70°C.
 Frame Stainless steel frame (2mm), mounted on the floor. Can be moved as a whole. 
The installation of pulleys ensures easy movement.
Wall 2mm stainless steel mirror panel is selected, which is strong and beautiful, the wall opens the door, and there is a glass observation port.
 Floor The thickness is 2mm stainless steel mirror panel.
 Roof 2mm stainless steel mirror panel is selected, which is strong and beautiful.
Sealing material Use silicone rubber strips and glass sealant.
Incoming sampling tube material Stainless steel or polytetraethylene, four injection ports and four sampling ports are required.
Stirring device Small fan (stainless steel), the fan is equipped with a protective net to ensure the stability and the mixing degree is guaranteed to be above 80.
Exhaust With exhaust duct, can be used for sewage.
Operating gloves Operation gloves are installed on the test bulkhead to facilitate the operation of the purifier during the test.
Mobile platform A movable platform is installed inside the test chamber to facilitate the movement of the purifier during the test
 Air tightness The air leakage rate in the test chamber should be less than 0.05 h-1. (natural decay experiment)

 

Company Profile

3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber3m³ Air Purifier Energy Efficiency Test Chamber

FAQ


1.Q :How to provide after-sales service?
A:If customers need our engineers to come to the site for service, we will send out engineers to provide repair service for you.

2.Q: Can we visit and study in your factory?
A: Welcome to visit and study in our factory, we will show you our R&D and production capacity.

3.Q :Can I install and commission the calibration equipment on site?
A: Yes, we can send technicians and engineers to the customer's site for installation, commissioning and calibration.

4.Q: What are the transportation methods?
A :Air freight, sea freight, railroad transportation, all transportation methods according to the customer's needs.

5.Q : What are the packing methods?
A: Standard export wooden box packaging, solid and firm.

6.Q :How do you calibrate the equipment?
A: We have our own calibration and third-party calibration.

7.Q :What are the payment methods?
A :The payment methods are T/T, CIF, Paypal, L/C, VISA and so on.

8.Q :How long is the warranty period?
A :Warranty is 1 year, lifetime free service.

9.Q :What is the delivery time for your company's products?
A :This depends on the actual product you order, usually at least 30 days.

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASI2321479". Items marked "verified" are certified.

Watch Video
Watch Video
Dongguan Huanyi Instrument Technology Co., Ltd.
Dongguan Huanyi Instrument Technology Co., Ltd.
Dongguan Huanyi Instrument Technology Co., Ltd.
Dongguan Huanyi Instrument Technology Co., Ltd.
Dongguan Huanyi Instrument Technology Co., Ltd.
Dongguan Huanyi Instrument Technology Co., Ltd.
Dongguan Huanyi Instrument Technology Co., Ltd.
Dongguan Huanyi Instrument Technology Co., Ltd.

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory & Trading Company
Address
Room 101, 201, Building 2, No. 3, Longkeng Xingye Road, Dongkeng Town, Dongguan, Guangdong, China
verified Plant Area
3000 square meters
verified Number of Employees
41
verified Registered Capital
10,000,000 RMB
verified Terms of Payment
T/T, LC, D/P, PayPal, Western Union, Small-amount payment
verified International Commercial Terms(Incoterms)
FOB, CFR, EXW, CIF
verified Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: one month
verified Nearest Port
Shenzhen
verified Minimum Order Quantity
1 Set
verified Supply Chain Partners
500

Our Production Capability & Technical Expertise

verified Main Products
Programmable Constant Temperature and Humidity Test Chamber, Rapid-rate Thermal Cycle Chamber, Thermal Shock Test Chamber
verified Production Lines
3
verified Production Machines
Welding Machine
verified QA/QC inspectors
2 people
verified Inspection Type for Finished Products
100% inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Have instruction but no written records
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
3 people
verified Traceability of Raw Materials
Yes

Our Industry Experience & Global Business Record

verified Year of Establishment
2007-03-20
verified Export Year
16 Years
verified Main Markets
North America, Southeast Asia/ Mideast, Domestic
verified Repeat Buyers Choice
30%~50%
verified Number of Foreign Trading Staff
3
verified Overseas Agent/Branch
No
verified New Products Launched in Last year
No

Our Certifications, Standards & Industry Recognition

verified Product Certification
CE
verified Cooperated with Fortune 500
Yes

FAQ

How to provide after-sales service?
If customers need our engineers to come to the site for service, we will send out engineers to provide repair service for you.
Can we visit and study in your factory?
Welcome to visit and study in our factory, we will show you our R&D and production capacity.
Can I install and commission the calibration equipment on site?
Yes, we can send technicians and engineers to the customer's site for installation, commissioning and calibration.
What are the transportation methods?
Air freight, sea freight, railroad transportation, all transportation methods according to the customer's needs.
What are the packing methods?
Standard export wooden box packaging, solid and firm.
How do you calibrate the equipment?
We have our own calibration and third-party calibration.
What are the payment methods?
The payment methods are T/T, CIF, Paypal, L/C, VISA and so on.
How long is the warranty period?
Warranty is 1 year, lifetime free service.
What is the delivery time for your company's products?
This depends on the actual product you order, usually at least 30 days.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now