| Customization: | Available |
|---|---|
| After-sales Service: | 1 Year |
| Power Supply: | AC220V/380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Simulation Training Pod | External Dimensions | ≥4.5m × 4.5m × 3.2m (Length * Width * Height) |
| Internal Space | ≥4.25m × 4.25m × 2.6m (Length * Width * Height) | |
| Material | High-density magnesium oxide board insulation layer, thickness not less than 50mm, meeting requirements for corrosion resistance, heat preservation, and flame retardancy, Class A fireproof; PVC flooring, 2mm thick. | |
| Configuration | 4 panel lights; pre-installed sockets including 4 network ports, 4 RS485 ports, and 4 five-hole 220V AC sockets. | |
| Clean and airtight swing door | 1 door, dimensions ≥ 1.0 m * 2.1 m (width * height) | |
| Observation window dimensions | ≥ 0.6 m * 0.6 m | |
| Surface painting | A multi-coat anti-corrosion process is used, with a primer to enhance adhesion, a mid-coat to improve smoothness, and a topcoat to enhance aesthetics. The surface coating has anti-corrosion and wear-resistant properties. | |
| Alarm function | When system hardware malfunctions, such as equipment failure or power failure, the system will immediately sound an audible and visual alarm. In case of power failure or emergency, there are prominent and bright escape routes and signs, and portable fire extinguishers are available. | |
| Air Conditioning Unit | One air conditioning unit with temperature control | Cooling capacity ≥ 10kW, heating capacity ≥ 8kW. Capable of regulating the cabin temperature to 18ºC~25ºC. |
| Running for 1 hour | It can raise the room temperature to 23ºC±1ºC. | |
| Temperature control range | 18ºC~25ºC | |
| Temperature deviation | ≤±1ºC | |
| Temperature rise/fall rate | Average temperature rise/fall rate ≥0.5ºC/min when the cabin is unloaded. | |
| Temperature control system | Consists of refrigeration system, heating system, etc. | |
| Fresh Air Unit | The fresh air handling unit must be able to accommodate at least 5 people at full capacity, with a fresh air volume of no less than 30 m³/person·h. | |
| Ventilation system | Mainly composed of butterfly valves, ducts, auxiliary fans, and filter purification boxes. | |
| Ventilation duct material | Polypropylene (PP), with added halogen-free flame retardants, meeting environmental protection requirements; combustion performance reaches B1 standard. | |
| The air inlet and outlet of the cabin | Both are equipped with filters with an efficiency of not less than 99.95% and a filtration efficiency of ≥99.95% for 0.3μm, ensuring that the air entering the cabin environment is filtered. | |
| Flat panel light | Natural flat panel light ≥ 4 pieces | |
| Single piece size: 0.6m × 0.3m (length * width) | ||
| Frame material: narrow-bezel aluminum alloy | ||
| Color temperature ≥ 4500K | ||
| Color rendering index Ra ≥ 95 | ||
| Experimental Platform | The lab bench measures ≥2.5mm*0.75mm*0.8mm (length*width*height), includes a separate small sink and faucet; the surface is made of solid double-sided phenolic resin board with double-layered thickened edges of the same material, and a storage cabinet is provided underneath for storing items. | |
| Steel Frame | Constructed from 40*60*1.5mm high-quality cold-rolled square steel tubing. The metal surface undergoes acid pickling, phosphating, and other chemical rust-prevention treatments, followed by epoxy resin high-pressure electrostatic powder coating. Screw holes connecting to the connectors are welded using a riveting welding process. All screws on the support frame are international standard hexagonal screws, ensuring excellent corrosion resistance, tightness, and durability without deformation under long-term load. | |
| Cabinet | Constructed from high-quality 15mm thick MDF with PVC fully automatic edge banding. | |
| Worktop | Constructed from 12.7mm solid core phenolic resin board, with edges thickened to 25.4mm. | |
| The laboratory bench comes with two adjustable stools to accommodate different heights. | ||
| Hand Sink | Handwashing Sink | Quantity: 1 piece, dimensions: ≥0.6mm*0.5mm*0.3mm (length*width*height), installation height: countertop 800mm from the ground. The sink is made of brand new PP material, free of calcium carbonate. |
| The drain and sink are integrally injection molded. The inner wall of the sink is free of shrinkage marks, the four sides are flat, and the surface is smooth and free of obvious defects such as scratches, cracks, bubbles, and edge bursts. The sink wall thickness is 5mm. | ||
| Eyewash Station | Tabletop three-port eyewash station, made of thickened copper-plated material. | |
| Working pressure | 0.2~0.4Mpa. | |
| Eyewash flow rate | ≥11.4L/min. | |
| Operating medium | Standard clean water at room temperature. | |
| Material | Thickened copper-plated body, with excellent resistance to oil, acid, alkali, and hydrochloric acid solutions. | |
| Monitoring System | Used for monitoring personnel activities within the monitoring cabin. The cameras automatically switch between color and monochrome modes and are used in conjunction with long-range infrared lights to achieve normal monitoring in low-light environments. | |
| Two cameras | Providing 360° coverage of the training activities of the subjects and the operation of the equipment within the cabin. Pixel count ≥ 4 megapixels, resolution ≥ 2304*1296. | |
| Hard disk recorder | Supports up to 24 SATA hard drives, with a single hard drive capacity ≤ 10TB. External hard drives can be connected via eSATA interface. | |
| Hard disk capacity | ≥ 24TB. Monitoring footage is recorded 24/7 in real-time on a video disk array in the control room. All recorded data is retained for ≥ 90 days and meets D1, 720P, and 1080P recording quality standards. | |
| Basic Equipment | Circular cable outlet, 200mm in diameter, located at the center of the bottom of the equipment room at the front of the training cabin, primarily used for routing various electrical cables. | |
| Cable tray | Located in the center of the top of the training cabin, with at least four cable outlets. | |
| Structured cabling | Pre-installed with Category 6 network cables and telephone lines to the communication cabinet patch panel, allowing for easy removal and maintenance. | |
This laboratory can be used for athletes' high-altitude training and low-altitude exercise, extreme physical training for athletes, research on human function in hypoxic environments, research on human movement science, research on biopharmaceuticals, human hypoxia rehabilitation therapy, research on human psychology and physiology, research on the performance of electronic equipment, research and testing of clothing materials, and experimental research on biological culture, etc. It has a wide range of applications in scientific research scenarios and is highly applicable.








