Scope of application
It is mainly used in aerospace, aviation, units, electronics, IT industries and other test products for adaptability testing under conditions of rapid changes in ambient atmospheric temperature and safety performance testing of electronic components, parts and products (complete machines), providing reliable Sexual testing, product screening, etc., and at the same time, product quality control can be carried out through this test.
1. Use the internationally accepted energy storage method to conduct impact tests at hot and cold temperatures.
2. Touch-sensitive color LCD display human-machine interface controller, easy to operate.
3. Graphical function display, with abnormal or fault display and troubleshooting instructions.
4. The temperature control has high precision and all adopts PID automatic calculation control.
5. Can be upgraded to rapid temperature change test.
6. It has a reservation start function and can choose the impact mode.
7. Adopt advanced cold end balance control and PID automatic adjustment technology to achieve energy saving of more than 30% at high and low temperature constant temperatures.
8. The compressors and accessories of the refrigeration system are all made of internationally renowned brands with long-lasting and reliable operation, excellent workmanship, low failure rate, and environmentally friendly refrigerants, which comply with the requirements of international environmental protection conventions.
Classification of Thermal Shock Test Chamber (hot and cold shock test chambers)
The structure of the thermal shock test chamber usually has three forms: single box type, vertical lifting type and horizontal two box type. The comparison of the three structures is shown in Table 1. Comprehensive comparison of the above three forms, the single-box type requires a large amount of cooling and heating. This structure has poor feasibility and has few practical applications: the vertical lifting type avoids the influence of the external environment through internal lifting conversion. , but since the lifting device itself consumes cooling or heat as a heat load, this method is usually suitable for small test chambers. For medium and large test chambers, this method is not applicable because the lifting device is too heavy: horizontal two-box type Through the mutual conversion between the two boxes, the load of the box is reduced and the cooling and heating capacity of the equipment are reduced. However, a horizontal conversion device is required and will be affected by the external environment. Therefore, the choice of test method should be analyzed based on the specific situation. For small equipment, the vertical lifting method can save one box, which can save costs; for medium and large test equipment, as long as the plan is reasonable and feasible, a horizontal two-box test can be used program is a better choice.
Equipment composition
Thermal shock test chamber equipment consists of low temperature box, high temperature box, refrigeration system, heating system, control system, conversion device and other equipment. The low-temperature box provides a low-temperature platform for the hot and cold shock test chamber, and can also conduct low-temperature tests separately: the high-temperature box provides a high-temperature platform for the hot and cold shock test chamber, and can perform high-temperature tests at the same time: the refrigeration system provides a low-temperature environment for the low-temperature box: the heating system is The high temperature box provides a high temperature environment: the control system completes the control and measurement of the equipment and test process; the conversion device is used to convert the specimen during the test process.
GB/T 2423.1, IEC60068-2-1, GB/T 2423.2, IEC60068-2-2,
GB/T 2423.22, GJB150.3A, GJB150.4A, GJB150.5A,
GB/T10589, GB/T10592, GB/T11158, etc.
Model |
HYTS-50 |
HYTS-80 |
HYTS-150 |
HYTS-250 |
HYTS-330 |
Test Space W x H x D (mm) |
350x400x360 |
400x500x400 |
500x600x500 |
600x700x600 |
700x800x600 |
External Dimension W x H x D (mm) |
1280x1920x1160 |
1320x2000x1520 |
1500x2100x1700 |
1600x2200x1900 |
1700x2300x1900 |
Pre-cooling Zone Temp. |
-10~-75ºC |
Pre-heating Zone Temp. |
+50~+220ºC |
Pre-cooling Zone Cooling Rate |
-10~-40ºC<30mins -10~-60ºC<50mins -10~-75ºC<65mins |
Pre-heating Zone Heating Rate |
+50~150ºC<30mins +50~180ºC<50mins +50~220ºC<60mins |
Testing Zone Temp. |
B Type :-40~150ºC C Type:-55~150ºC D Type:-65~150ºC |
Temp. Recovery Time |
≤ 5 mins |
Temp. Fluctuation |
≤±0.5ºC |
Temp. Deviation |
≤±2ºC |
Temp. Uniformity |
≤±2ºC |
Internal Material |
1.0mm thick SUS#304 high &low temperature resistance stainless steel. |
External Material |
Adopt flame retardant high strength PU Polyurethane foam insulation material. |
Control Method |
Touch screen programmable PLC, with USB interface, with RJ485 interface can be connected to computer controlling, special network control software, convenient remote monitoring, data acquisition. |
Compressor |
Tecumseh (France)-fully air-cooled double-fall cooling compressor. |
1.Q :How to provide after-sales service?
A:If customers need our engineers to come to the site for service, we will send out engineers to provide repair service for you.
2.Q: Can we visit and study in your factory?
A: Welcome to visit and study in our factory, we will show you our R&D and production capacity.
3.Q :Can I install and commission the calibration equipment on site?
A: Yes, we can send technicians and engineers to the customer's site for installation, commissioning and calibration.
4.Q: What are the transportation methods?
A :Air freight, sea freight, railroad transportation, all transportation methods according to the customer's needs.
5.Q : What are the packing methods?
A: Standard export wooden box packaging, solid and firm.
6.Q :How do you calibrate the equipment?
A: We have our own calibration and third-party calibration.
7.Q :What are the payment methods?
A :The payment methods are T/T, CIF, Paypal, L/C, VISA and so on.
8.Q :How long is the warranty period?
A :Warranty is 1 year, lifetime free service.
9.Q :What is the delivery time for your company's products?
A :This depends on the actual product you order, usually at least 30 days.